Florida energy calcs · Manual J, S & DEvery county.One price.

Form R405/R402 and Manual J, S & D for any Florida permit. Tell the assistant about the house, drop your plans, pay by secure checkout. 2–3 business days, or Expedited: within 24 business hours.

Florida only · Powered by Pineland Engineering · Sample packet

[ Prefer sliders? ]

The full
calculator.

Every input that sets the price, on one card. Same published price list the assistant uses. Same statewide price in all 67 counties.

See a sample packet (illustrative) →
Instant quoteLive
One statewide price
sq ft
≤2,500 base+$100+$200custom
Load section · 1 cell ≈ 500 sq ftillustrative
HVAC systems

2nd +$75 · 3+ custom

1
Package
Delivery speed
    Total$545
    Ready by—

    Standard: 2–3 business days. Expedited: within 24 business hours (+$150), the same clock time the next business day. The clock starts when complete plans and inputs pass intake: before 3:00 PM ET on a business day it starts then; after 3:00 PM, on weekends or holidays it starts at 9:00 AM ET the next business day. This ETA assumes intake passes now. Holidays: federal set plus the day after Thanksgiving and Christmas Eve.

    Upload plans & pay · $545
    [ 02 · How it works ]

    Plans in.Permit‑ready out.

    Four steps, online. Status by email and a tracking link. No account needed.

    Business-day clockexample
    MONIntake ✓
    TUEDay 1
    WEDDay 2
    SAT—
    SUN—

    The clock starts when your intake checklist passes; weekends don’t count. Holiday calendar TBD

    1. 01

      Upload plans

      Floor plan, elevations, window schedule. PDF or DWG.

    2. 02

      Intake check

      We check your plans and inputs against the intake checklist. Anything missing, we ask once. Your 2–3 business-day clock starts when it passes.

    3. 03

      Engineering

      Energy calc and Manual J, S & D, prepared to the code edition that applies to your permit application date. Sealed package: signed and sealed by a Florida-licensed PE.

    4. 04

      Delivered in 2–3 business days

      PDFs in your inbox and on your order page. Expedited: within 24 business hours, +$150. Plan-review revisions on the same design are free.

    [ 03 · Packages ]

    Three packages.
    One statewide price.

    Energy calc

    from$195
    • Form R405 (performance) or R402 (prescriptive)
    • PDF for your permit submittal

    Full package

    $445
    • Form R405 or R402
    • Manual J load calculation
    • Manual S equipment selection
    • Manual D duct design

    Sealed

    $595
    • Everything in the full package
    • Signed and sealed by a Florida-licensed PE
    • Only buy it if your job needs it

    Sealed calcs are signed and sealed by a Florida-licensed PE of Designda Inc. (dba Pineland Engineering).

    Size & systems · every package
    Up to 2,500 sq ft and 1 systemIncluded
    2,501–4,000 sq ft+$100
    4,001–6,000 sq ft+$200
    Each extra system (2 systems)+$75
    Over 6,000 sq ft, or 3+ systemsCustom quote
    Delivery & revisions
    Standard: 2–3 business daysIncluded
    Expedited: within 24 business hours+$150
    Plan-review comment revisions, same designFree
    Design changes$75 each

    One statewide price, all 67 counties. Prices in USD; card checkout at order. Delivery counts in business days from the clock start: complete plans passing intake before 3:00 PM ET on a business day start the clock that day; later, or on weekends and holidays, it starts at 9:00 AM ET the next business day.

    [ 04 · 2026 Florida code ]

    12.31.26

    The Florida Building Code, 9th Edition (2026) is scheduled to take effect December 31, 2026.

    82days to go · as of Oct 10, 2026

    The edition in effect on your permit application date governs that permit (F.S. 553.73(7)(d)). The adopting rule (61G20-1.001) is still a proposed rule, so the date could move.

    Read the 2026 guide
    1. 01
      R405 performance path: e-Ratio to pass, 0.85
    2. 02
      R405 proposed design: max fenestration SHGC 0.50 → 0.40
    3. 03
      The duct-testing exception is removed for R405 (performance) compliance.
    4. 04
      New R407 additional-efficiency requirement for the prescriptive path.

    Source: Florida Building Commission / DBPR, “Significant Provision Changes, 9th Ed. (2026) FBC Energy Conservation”; FAR notice for Rule 61G20-1.001; F.S. 553.73(7)(d). Verified Oct 9, 2026. Meter axes are illustrative; marked values are from the source.

    [ 05 · Sample packet ]

    See what
    you get.

    A fictional house, run through our packet layout. Four summary-style pages. Not a real project, not an official form.

    1. Cover + project summary
    2. Energy compliance summary (R405-style, illustrative)
    3. Manual J room-by-room loads
    4. Manual S equipment + Manual D duct summary
    Sample packet (illustrative)
    [ 06 · Questions ]

    Straight
    answers.

    What’s the difference between Form R405 and R402?

    R405 is the performance method: the whole house is modeled against a code reference house. R402 is the prescriptive method: each component meets a listed minimum. Not sure which your project uses? Pick “Energy calc” and tell us in the project details.

    Do I need the PE seal?

    Only if your building department or your project requires a sealed calc. Check with the department before you order. If you need it, choose the Sealed package ($595). Sealed calcs are signed and sealed by a Florida-licensed PE of Designda Inc. (dba Pineland Engineering).

    When does the delivery clock start?

    Standard takes 2–3 business days; Expedited: within 24 business hours (+$150). Complete plans passing intake before 3:00 PM ET on a business day start the clock then; later, or on a weekend or holiday, it starts at 9:00 AM ET the next business day. Friday 4 PM intake: clock starts Monday 9 AM, Expedited due Tuesday 9 AM.

    Which days are holidays?

    New Year's Day, Martin Luther King Jr. Day, Presidents Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus / Indigenous Peoples' Day, Veterans Day, Thanksgiving and the day after, Christmas Eve and Christmas. When a fixed-date holiday falls on Saturday we observe Friday; on Sunday, Monday. Holidays don't count as business days.

    Which code edition will my calc use?

    Under Florida law, the code edition in effect on the date you apply for the permit governs that permit for its life. The 9th Edition (2026) is scheduled to take effect Dec 31, 2026. Tell us your expected application date in the project details.

    What if plan review sends comments back?

    Revisions to address building-department plan-review comments on the same design are free: send the comments from your order page. Design changes (a different plan, layout or equipment) are $75 each. Building departments decide what they accept; we don’t guarantee approval.

    How is the price set?

    Package base price covers up to 2,500 sq ft and 1 system: energy calc from $195, full package $445, sealed $595. Add $100 for 2,501–4,000 sq ft, $200 for 4,001–6,000 sq ft and $75 for a second system. Over 6,000 sq ft or 3+ systems gets a custom quote. One statewide price, all 67 counties.

    Price it now.
    Upload when you’re ready.