Home/How it works

Plans in.
Permit‑ready out.

Four steps, all online. No account, no phone tag. You see the price before you upload, and the clock before you pay.

4Steps
2–3Business days
67Counties
$0Plan-review revisions

Upload plans

PDF or DWG. Floor plan, elevations, window schedule. Drag the files in, or send them later from your order page.

  • Floor plan with dimensions
  • Elevations and wall sections
  • Window and door schedule (U-factor, SHGC)
  • Mechanical plan, if you have one

Intake check

We check what you sent against the intake checklist. If something is missing, we ask once, in one email. When the checklist passes, your 2–3 business-day clock starts.

  • Plans complete and legible
  • Project address and county
  • Expected permit application date
  • Energy-model assumptions are allowed when needed
  • Actual equipment suggestions require paid Manual J + Manual S

Engineering

Energy calc (Form R405 performance or R402 prescriptive) and, in the Energy + Manual J package, Manual J room loads and a target tonnage range for the contractor's equipment selection, to the code edition that applies to your permit application date.

  • Room-by-room Manual J loads
  • Target tonnage range for the contractor to select equipment
  • Manual S and Manual D: available later, once the equipment model is chosen
  • Sealed package: Sealed calcs are signed and sealed by a Florida-licensed PE of Designda Inc. (Florida engineering license 39202).

Delivered

PDFs in your inbox and on your order page, within 2–3 business days of a passed intake. Plan reviewer sends comments? Revisions on the same design are free.

  • Energy compliance report
  • Manual J report with target tonnage (Energy + Manual J and Sealed)
  • Free revisions for plan-review comments, same design
  • Design changes $75 each

2–3 days,
defined.

Standard turnaround is 2–3 business days from receipt of complete plans and inputs. The clock starts when your intake checklist passes, not when you click upload. Weekends don’t count.

Business-day clock · try itAmerica/New_York
Intake checklist passes on
Delivery speed
Ready by
—

Example assumes intake passes at 10:00 AM ET, before the 3:00 PM cutoff. Weekends and holidays skipped (Mon Oct 12 is Columbus / Indigenous Peoples' Day).

Days the clock skips.

Weekends and these observed holidays are not business days. A fixed-date holiday on a Saturday is observed the Friday before; on a Sunday, the Monday after. The live ready-by clock and every quote use this same list.

2026

HolidayObserved (no business day)
New Year's Day
Martin Luther King Jr. Day
Presidents Day
Memorial Day
Juneteenth
Independence Day
Labor Day
Columbus / Indigenous Peoples' Day
Veterans Day
Thanksgiving
Day after Thanksgiving
Christmas Eve
Christmas Day

2027

HolidayObserved (no business day)
New Year's Day
Martin Luther King Jr. Day
Presidents Day
Memorial Day
Juneteenth
Independence Day
Labor Day
Columbus / Indigenous Peoples' Day
Veterans Day
Thanksgiving
Day after Thanksgiving
Christmas Eve
Christmas Day