Seminole County energy calcs & Manual J.

Seminole County reviews residential permits through Building Permits Online and its ePlan system, and wants energy calculations uploaded to the ePlan documents folder as their own PDF. Missing energy calcs are on its list of common residential review comments. Seminole is climate zone 2A and designs to Sanford’s 93°F cooling and 38°F heating limits. Sanford and Oviedo permit on their own.

Updated Primary sources · 8 cited
93°F1% cooling
38°F99% heating
2AClimate zone
86°FFL 1% cooling range694°F
At a glance
Department
Seminole County Building DivisionSanford · Building Permits Online + ePlan1
Climate zone
Zone 2A1% cooling 93°F · 99% heating 38°F56
Code edition
FBC Energy Conservation, 8th Ed. (2023)9th Ed. (2026) scheduled for Dec 31, 2026 · what changes
Evidence
8 primary sourcesEvery number on this page links to its source · references
Price
$175 · $225 · $400Energy calcs · Manual J · both (stamp +$300). Same in all 67 counties · price list
Ready by
2–3 business daysExpedited: within 24 business hours. +$150 surcharge. Clock starts when complete plans pass intake (3:00 PM ET cutoff) · how it works

What Seminole reviewers ask for

Seminole’s Building Division runs on two systems: Building Permits Online, where you request an application number, and ePlan, where you upload the package. Energy calculations belong in the documents folder as an individually named PDF, and the county accepts intuitive names such as “Energy Calculations,” “Ecalcs” or “Energy Calcs.”1 You have seven calendar days after the online request to upload the complete package and complete the task; until the task is completed, the county is not notified that you are ready.1

“Provide energy calculations” appears on the county’s list of common residential review comments, alongside drainage plans and signed and sealed truss packages.1 The county’s own flowchart estimates 7 to 10 business days for plan review, after zoning and other agency steps.1 We deliver the energy calc and each Manual report as separate PDFs so nothing has to be split, which matters because ePlan wants each file uploaded on its own.

Master permits

Every orientation, worst case for the climate zone

Builders filing one model many times use Seminole’s master building permit. Its process document asks for energy performance calculations for all building orientations, considering worst-case scenarios for the climate zone, with the design professional of record signing the plans and product approvals.2 For a model we run the R405 at each orientation and report the worst case, so the same calc covers every lot the model is built on. See what an R405 package includes.

Building departments

3 departments · addresses, phones, portals

The county permits unincorporated Seminole from the County Services Building in Sanford, weekdays 8 a.m. to 5 p.m., with the last counter sign-in at 4:30 p.m.; owner-builders start with an office visit and valid ID.1 Sanford takes applications through Citizenserve, and Oviedo runs its own Building Services.34 For Altamonte Springs, Casselberry, Lake Mary, Longwood or Winter Springs, confirm the jurisdiction and use that city’s own building page.

DepartmentAddressPhonePortal
Seminole County Building Division (unincorporated)County Services Building, first floor west entrance, 1101 E. First St., Sanford, FL 32771407-665-7050Building Permits Online + ePlan1
City of Sanford, Building Division300 N. Park Ave., Sanford, FL 32771407-688-5150Citizenserve3
City of Oviedo, Building Services320 Alexandria Blvd., Oviedo, FL 32765Official pageOnline applications4

Design conditions

93°F cooling · 38°F heating · zone 2A · Sanford
93°F1% cooling design limit
38°F99% heating design limit
2AClimate zone (FBC-EC 8th Ed.)
18°FCooling ΔT vs 75°F indoor

Seminole’s RESNET limits come from Sanford: 93°F at 1% cooling and 38°F at 99% heating, two degrees hotter in summer than Volusia’s coastal figure.6 The county is climate zone 2A.5 Our reading: at a 93°F design, west and south glass is where a load calc earns its keep, especially on two-storey houses. Running the actual orientation, not a rotated average, can be the difference between two equipment sizes.

Local housing

Median year built 1988 · 66.2% owner-occupied · Census ACS
1988Median year built
61.4%Single-family detached
2.1%Mobile homes
92.3%Electric heat
66.2%Owner-occupied
893New 1-unit permits, 2025

Seminole is largely built out: it issued 893 permits for new single-family units in 2025, 31st in the state, against 2,079 in Volusia.7 The median home dates from 1988 and two-thirds are owner-occupied, the lowest share in the East Central group.8 That points to additions, remodels and equipment replacement; our guide to Manual J on a changeout covers what the code and departments expect.

Seminole County questions

3 answers · How do I submit energy calcs in Seminole County?

How do I submit energy calcs in Seminole County?

Request an application number through Building Permits Online, then upload files to ePlan. Energy calculations go in the documents folder as an individually named PDF; the county accepts plain names such as “Energy Calculations,” “Ecalcs” or “Energy Calcs.” Complete the upload task, or the county is not notified that you are ready for review.

What does Seminole County need for a master permit model?

The county’s master permit process asks for energy performance calculations for all building orientations, considering worst-case scenarios for the climate zone, alongside sealed construction plans and truss specifications. We run the model at every orientation and report the worst case.

Do I need a permit to replace an A/C unit in Seminole County?

Yes. Seminole lists replacement of a condenser, an air handler or both, or a package unit, among work that requires a permit. What the department wants attached for a changeout is on its forms and applications page.

Price

$175Energy calcs (R405)
$400R405 + Manual J
+$300PE stamp, any package
2–3Business days

One statewide price in all 67 counties. Building departments decide what they accept; we don’t guarantee approval. Revisions for plan-review comments on the same design are free.

Start your order Plans in, price shown before you pay

Sources

8 primary references · numbered to match the citations
  1. 01Seminole County, Building Divisionseminolecountyfl.gov
  2. 02Seminole County, Master Building / Engineering Permit Process (PDF, May 2025)seminolecountyfl.gov
  3. 03City of Sanford, Building Divisionsanfordfl.gov
  4. 04City of Oviedo, Building Servicescityofoviedo.net
  5. 052023 Florida Building Code, Energy Conservation (8th Ed.), Table R301.1, climate zones by countyup.codes
  6. 06RESNET / ENERGY STAR, Appendix A: HVAC Design Temperature Limits by State and County (v4, 2019). 1% cooling and 99% heating values drawn from the ASHRAE 2013 Handbook of Fundamentals and ACCA Manual J 8th Ed.resnet.us
  7. 07U.S. Census Bureau, Building Permits Survey, 2025 annual county data (new privately-owned 1-unit housing units)www2.census.gov
  8. 08U.S. Census Bureau, American Community Survey 2020–2024 5-year estimates (B25003, B25018, B25024, B25035, B25040), via Census Reportercensusreporter.org