Sumter County energy calcs & Manual J.
Florida's newest housing, and a CO that waits on the blower door.
Sumter County's residential submittal page asks for the Florida energy efficiency code forms with Manual J and Manual D, and its certificate-of-occupancy request needs the blower door test and insulation certificate uploaded. Plan review sits at the Villages Sumter County Service Center in Wildwood. Sumter is climate zone 2A, designed at 92°F cooling and 39°F heating.
- Department
- Sumter County Building ServicesVillages Sumter County Service Center · Citizenserve / online permitting1
- Code edition
- FBC Energy Conservation, 8th Ed. (2023)9th Ed. (2026) scheduled for Dec 31, 2026 · what changes2
- Climate zone
- Zone 2A1% cooling 92°F · 99% heating 39°F3
- Price
- $195 · $445 · $595Energy calc from · full package · sealed. Same in all 67 counties · price list
- Ready by
- 2–3 business daysExpedited: within 24 business hours, +$150. Clock starts when complete plans pass intake (3:00 PM ET cutoff) · how it works
- Evidence
- 12 primary sourcesEvery number on this page links to its source · references
What Sumter reviewers ask for
The conventional residential page lists 'Florida energy efficiency code with Manual J and D' between the product approval numbers and the site plan.4 The county's printable checklist puts it as two copies of the Florida Energy Code compliance forms 'with J forms', or a single copy for online submittals, where engineered documents must be electronically verifiable.5
The rest of the Sumter submittal notes2 more paragraphs
Paper is still accepted: one paper or electronic copy, unless sheets run larger than 11 by 17, in which case the county wants two.4 Additions follow the same pattern, with Manual J and D 'if applicable', and add The Villages Architectural Review Committee approval where it applies.6 In an A or AE flood zone the house must sit a foot above base flood elevation, proven with under-construction and final elevation certificates.5
The energy work comes back at the end. To request a certificate of occupancy on a new single-family home, email the building office with 'Request for CO' and the permit number after uploading the blower door test and insulation certificate, along with the final termite treatment and any Wildwood utility or septic approvals.1 We put the R405's air-leakage target on our cover sheet so whoever runs the blower door knows the number.
Building departments
1 department · addresses, phones, portals
Almost every new house in Sumter is a county permit: unincorporated Sumter issued 3,098 of 3,105 one-unit permits in 2025, and Bushnell issued 7.89 The county has joint planning agreements with Wildwood and Bushnell; property inside them may face added standards or annexation, and the county refers applicants to Wildwood (352-330-1330) or Bushnell (352-793-2591).1
| Department | Address | Phone | Portal |
|---|---|---|---|
| Sumter County Building Services (Villages Sumter County Service Center) | 7375 Powell Rd., Suite 115, Wildwood, FL 34785 | 352-689-4400 | Citizenserve / online permitting1 |
Design conditions
92°F cooling · 39°F heating · zone 2A · weather stations
Cooling station: Leesburg Regional (ASHRAE). Heating station: Leesburg Regional (ASHRAE).3
Sumter shares Leesburg Regional's limits with Lake: 92°F cooling and 39°F heating.3 Zone 2A.2 The county's FAQ gives its design wind speed as 135 mph, which matters for the structural sheets rather than the load calc.1
Worked example
1,700 sq ft house → 23,260 Btu/h, 1.94 tons · illustrative
Illustrative · not a Manual J
A 1,700 sq ft two-bedroom single-storey home, smaller than our other examples because Sumter's median home has 5.2 rooms.10 Block walls and the 50-grain moisture difference are our assumptions.
| House | new single-storey block home, Wildwood area |
|---|---|
| Conditioned area | 1,700 sq ft, 1 storey, 9 ft ceilings |
| Bedrooms / occupants | 2 / 3 |
| Glazing | 14% of floor area (238 sq ft), U 0.32, SHGC 0.25 |
| Walls / ceiling | R-7.8 walls, R-38 ceiling under a vented attic |
| Air leakage | 5 ACH50 |
| Ducts | in the attic, 8% gain allowance |
| Ventilation | mechanical, per FBC formula |
| Outdoor design | 92°F cooling / 39°F heating (sourced above) |
| Indoor design | 75°F cooling / 70°F heating |
| Design grains difference | 50 gr/lb (assumption) |
Illustrative only. A simplified block-load estimate with the inputs shown, not an ACCA Manual J, and not for permitting. A real calc goes room by room with your plans, orientation and equipment data. Code ceiling for single-stage cooling at 1.15× total load: 26,750 Btu/h.11
Local housing
Median year built 2006 · 82.3% single-family detached · Census ACS
Sumter has Florida's newest housing: the median unit was built in 2006 and 70.6% date from 2000 or later, both the highest of all 67 counties.1012 It also leads the state in owner occupancy (87.6%) and single-family detached share (82.3%).12 Only 73.9% of occupied homes heat with electricity, second-lowest in Florida, so a gas furnace rather than a heat pump is a real possibility in the Manual S; tell us which the house uses.12
Utility rebates
Duke Energy Florida
- Duke Energy Florida. Duke Energy Florida customers can claim up to $1,000 in HVAC rebates, $300 for an A/C and $500 for a heat pump, after a Home Energy Check within 24 months. We haven't verified which utility serves a given Sumter address.7
Utility programs change often; check the program page before you count on a rebate.
Sumter County questions
3 answers · What does Sumter County need before issuing a certificate of occupancy?
What does Sumter County need before issuing a certificate of occupancy?
For a new single-family home, upload the blower door test, insulation certificate, final termite treatment, and any City of Wildwood utility or Health Department septic approval to the permit, then email building@sumtercountyfl.gov with 'Request for CO' and the permit number in the subject. All required inspections must have passed first.
Does Sumter County need a Manual D?
For new conventional homes, yes: the county's residential submission page lists the Florida energy efficiency code with Manual J and D. For additions it lists the same item 'if applicable'. Online submittals need only one copy, and engineered documents must be electronically verifiable.
Do additions in The Villages need extra approval?
Yes. Sumter County's addition requirements include The Villages Architectural Review Committee approval where it applies, alongside sealed plans, a truss engineering package, a site plan with setbacks and septic location, and energy code forms with Manual J and D if applicable. Owner-builders must appear in person before issuance.
Price
One statewide price in all 67 counties. Building departments decide what they accept; we don’t guarantee approval. Revisions for plan-review comments on the same design are free.
Nearby and related
Sources
12 primary references · numbered to match the citations
- 01Sumter County, Building Services (FAQs and contact)sumtercountyfl.gov
- 022023 Florida Building Code, Energy Conservation (8th Ed.), Table R301.1, climate zones by countyup.codes
- 03RESNET / ENERGY STAR, Appendix A: HVAC Design Temperature Limits by State and County (v4, 2019). 1% cooling and 99% heating values drawn from the ASHRAE 2013 Handbook of Fundamentals and ACCA Manual J 8th Ed.resnet.us
- 04Sumter County, Conventional Construction – Residentialsumtercountyfl.gov
- 05Sumter County Form Center, Building – Submittal Requirements – Residential – Checklistsumtercountyfl.gov
- 06Sumter County, Additions – Residentialsumtercountyfl.gov
- 07Duke Energy Florida, Rebate for HVAC Replacementduke-energy.com
- 08U.S. Census Bureau, Building Permits Survey, 2025 annual place data, South Region (1-unit housing units by permit-issuing place)www2.census.gov
- 09U.S. Census Bureau, Building Permits Survey, 2025 annual county data (new privately-owned 1-unit housing units)www2.census.gov
- 10U.S. Census Bureau, American Community Survey 2020–2024 5-year estimates for Sumter County, FL (B25018, B25024, B25034, B25035, B25003, B25040), via Census Reportercensusreporter.org